|
Coal production at Ovoot Tolgoi 46 KB, approx. 10 seconds at 56.6Kbps |
|
Coal production at Ovoot Tolgoi 40 KB, approx. 9 seconds at 56.6Kbps |
|
Shovel loading Truck 111 KB, approx. 22 seconds at 56.6Kbps |
|
Mining Ramp to 1st Bench 119 KB, approx. 23 seconds at 56.6Kbps |
|
Ovoot Tolgoi Site 36 KB, approx. 8 seconds at 56.6Kbps |
|
2008 Exploration Program 202 KB, approx. 39 seconds at 56.6Kbps |
|
Mongolian Permit Commission 222 KB, approx. 42 seconds at 56.6Kbps |
|
Liebherr 994 Excavator Erection 114 KB, approx. 22 seconds at 56.6Kbps |
|
G.W. FEL 950 126 KB, approx. 24 seconds at 56.6Kbps |
|
Terex truck fleet 93 KB, approx. 18 seconds at 56.6Kbps |
|
L-950 Coal Loader 59 KB, approx. 12 seconds at 56.6Kbps |
|
Stripping, piling topsoil in west pit 2 38 KB, approx. 8 seconds at 56.6Kbps |